SAIA Terminal – St. Peters, MO
This facility is a ground-up design-build project which includes 5,500 square feet of office space, a 46,000 square foot dock with 101 dock doors, and a 13,000 square foot maintenance facility. The construction consists of concrete tilt-wall panels with conventional steel framing which gives the owner a very clean-looking, long-lasting, and durable structure. This project was completed in ten months while enduring the winter conditions of St. Peters, Missouri.