Industrial
Johnson Controls Seat Assembly Plant Addition
Madison, Mississippi The project consisted of a 48,000 square foot addition to an operating, automobile seat assembly plant that serves the nearby Nissan facility. The addition had to be designed and build-ready for the installation of equipment in three winter months. Utilities and compressed air services had to be relocated while maintaining the “just-in-time” delivery…
Read MoreGeneral Motors Fort Wayne Assembly Plant
Fort Wayne, Indiana This is an 112,000 square foot logistics center for staging the delivery of parts into the adjacent General Motors plant in Fort Wayne, Indiana. This design-build project was designed and constructed within six months of the notice to proceed with the work. The steel framed building has a metal siding exterior, precast…
Read MoreInter-City Products Distribution Center
Lewisburg, Tennessee Inter-City Products, USA is among the largest manufacturers of residential and light commercial heating and air conditioning units in North America. The new distribution center fulfills the goal of centralizing production and distribution in Lewisburg, Tennessee. It supports an hourly workforce of more than 2,600 people. The 500,000 square foot building was completed…
Read MoreBluegrass/Brown Forman Cooperage
Lynchburg, Tennessee D.F. Chase completed the construction of a 35,000 square foot used-barrel storage facility for Bluegrass Cooperage. This construction included a 7,000 square foot office space with 28,000 square feet of warehouse/industrial space.
Read MoreRich Products – Murfreesboro, TN
D.F. Chase, Inc. completed a major plant expansion for Rich Products, the world’s largest frozen dough facility. A leading supplier of baked goods to food-service companies and bakeries worldwide, the 60,000 square foot expansion doubled both the size and production of its Murfreesboro, Tennessee facility.
Read MoreSecond Harvest Food Bank
Nashville, Tennessee This 80,000 square foot facility for distributing food to the hungry includes a 8,250 square foot freezer, a 3,800 square foot cooler, and a 3,000 square foot cook/chill production area. This new, state-of-the-art facility provides for the converting of perishable foods into shelf-stable products. Previous Page
Read MoreGeneral Motors Logistical Optimization Center – Spring Hill, TN
Spring Hill, Tennessee D.F. Chase, Inc. was selected to construct this 328,000 square foot facility which serves as a parts distribution center for General Motor’s Saturn manufacturing facility. The facility was constructed in four months and features precast exterior wall panels. Previous Page
Read MoreGeneral Motors Logistical Optimization Center – Oklahoma City, OK
Oklahoma City, Oklahoma This 310,000 square foot cross dock facility was constructed for Crown Enterprises, an affiliate of Linc, Inc. The building serves as an automotive sub-assembly distribution center for General Motors. The structure is a conventional steel frame with pre-cast exterior walls and a metal roof. Previous Page
Read MoreVerus 840 Business Center #2
Nashville, Tennessee D.F. Chase, Inc. was chosen to construct this 436,800 square foot distribution center in Nashville, Tennessee. The center includes cross docks with all tilt walls. This project was completed in six months. Previous Page
Read MoreGallatin Redrying and Storage Company
Gallatin, Tennessee This project included demolition of an existing tobacco processing facility and erection of a new 47,494 square foot structural steel facility to house current operation and allow for expansion and technology advancements for R.C. Owen Redry Facility. Work included complete weather protection of all existing systems and machinery to allow owner to save…
Read More