Frost Building Renovation

Nashville, Tennessee    Built in 1914, the historic Frost Building served as the first permanent home of the Baptist Sunday School Board. As part of the renovation, D.F. Chase’s fourth major construction project for the Sunday School Board, the five- story Frost Building was gutted to its structure. The plumbing, electrical and sprinkler systems were…

Read More

Del Webb Providence Amenity Center

Mt. Juliet, Tennessee     D.F. Chase, Inc. constructed a 28,000 square foot amenity center for the Del Webb Community in Mt. Juliet, Tennessee. Some of the indoor features include a fitness area complete with equipment, indoor swimming pool, catering kitchen, and extra rooms used for various activities. Outdoor amenities include an outdoor theatre, pool, and…

Read More

Averitt Express Call Center

Cookeville, Tennessee     D.F. Chase, Inc. constructed a 49,500 square foot corporate headquarters and call center. This two-story steel frame, brick and glass building is the anchor for Averitt’s corporate campus. The building involves work stations for 400 people with support services. Through the teaming process with architect, engineer and data professionals, D.F. Chase, Inc.…

Read More

North Central Telephone Cooperative Central Office Annex

Lafayette, Tennessee    The facility is a 3,400 square foot insulated, precast concrete building designed to take the direct impact of an F5 tornado and includes Steelcraft Paladin tornado resistant doors, dual power feed, back-up generator, specialty Liebert/CRAC HVAC systems and FM FE 25 clean agent fire suppression systems. The flooring is a grounded static…

Read More

The Department of Veterans Affairs Consolidated Patient Account Center (CPAC)

Smyrna, Tennessee    This design-build project included complete renovation of a 63,360 square foot old Wal-Mart building to house patients’ accounts for The Department of Veterans Affairs. The project included provisions for emergency power, server rooms protected by clean agent and preaction systems, stand-alone HVAC systems for data areas, and over 1,000,000 voice and data…

Read More

CityPlace, A Rawlings Foundation Project

LaGrange, Kentucky    This design-build project for The Rawlings Foundation in LaGrange, Kentucky consisted of the renovation of two existing structures and new construction for one building. One existing building was renovated into a LaGrange Visitor Center, and the other structure was converted into a public venue for community use. The new building was constructed…

Read More

Dex Imaging

Nashville, Tennessee    This 33,000 square foot building consists of a large warehouse space, offices, and sales areas.  The shell is constructed with concrete tilt panels with stone veneer at many locations. The roof system is constructed from metal joists and decking and covered with a TPO roof system.  The interior finishes consist of a…

Read More

Renovations to the William R. Snodgrass Tennessee Tower

Nashville, Tennessee   D.F. Chase, Inc. was selected as the design-builder for the Transforming Tennessee for Tomorrow (T3) consolidation and renovation initiative for the Tennessee Tower. The William R. Snodgrass Tennessee Tower renovation encompasses over 500,000 square feet of office building renovation. The renovations consist of removal and replacement of all interior finishes, extensive remodeling of…

Read More

The Rawlings Group Corporate Headquarters

Louisville, Kentucky    This 156,000 square foot building is the corporate headquarters for the Rawlings Group, a pharmaceutical and insurance benefits management firm in Louisville. This is the first phase of a seven-building corporate campus in Oldham County, Kentucky.  This first building contains three-story sections with a two-story connector, and features a white precast and…

Read More

Embraer Executive Jet Center – Windsor Locks, CT

Windsor Locks, Connecticut Located at Bradley County International Airport, this is the second of three similar facilities D.F. Chase, Inc. was contracted to build for Embraer. The three Jet Service Centers house Embraer’s new line of executive size jets that came off the assembly in Brazil. This approximate 50,000 square foot facility includes administrative, shop,…

Read More