Posted on

OCOEE MIDDLE SCHOOL (PHASE II)

Cleveland, Tennessee

Ocoee Phase II consists of a complete renovation of the gymnasium and locker rooms with epoxy coated floors as well as adding new access points to additional lobby, restrooms and concession area. The new gymnasium addition has three uses. The first is a full basketball court with bleacher seating, the second is a 700-seat auditorium with a full stage, and third is two full basketball courts for multiple team practices as well as gym classes. The addition is a colored pre-cast concrete structure with long span bar joist. The connector includes four team locker rooms, large public restrooms with ceramic tile, polished concrete lobby floors with outdoor courtyard seating areas, as well as new street side entrance and drop-off canopy.

Leave a Reply

Your email address will not be published. Required fields are marked *