Posted on

FEDEX GROUND, KNOXVILLE

Knoxville, Tennessee

SAAD Development called on D.F. Chase Construction to design-build a new 225,000 square foot fully-automated facility for end user FedEx Ground.  The facility had a tight timeline to be designed in about 45 days and construction to be ready to hand over the keys to FedEx within 10 months.  D.F. Chase was successful in turning over the building on time to a very pleased client, as well as the project came in under budget.

The site includes special features like two different types of sound walls to protect the adjoining neighborhoods from the parking lot truck noise and also extremely high security standards as are typical of the FedEx Ground parcel-handling facilities.  There is an elaborate automated gate and barrier system with a standalone security building including metal detectors and turnstiles to process both employees and visitors.

The building frame includes precast concrete exterior wall systems with an integral multi-color paint scheme surrounding a conventional steel frame and TPO roofing system.  The interior of this “all the bells and whistles” logistics’ center includes staff offices including many prototypical features specific to FedEx Ground use.

Posted on

OLD DOMINION FREIGHT LINE

Memphis, Tennessee

This design-build project for Old Dominion Freight Line in Memphis, Tennessee consists of 125,000 square feet of distribution space (267 dock doors), a 15,000 square foot main office, a 6,500 square foot administrative building, and a 40,000 square feet maintenance facility. Site work on this project includes a trailer and employee parking lot (35 acres), site lighting, a storm water management system, and underground utilities. The construction for all buildings consists of a concrete floor slab with concrete wall panels, and a conventional steel roof frame. The total duration for all construction activities was 14 months.


Previous Page